If you made any changes in Pure these will be visible here soon.

Fingerprint Fingerprint is based on mining the text of the person's scientific documents to create an index of weighted terms, which defines the key subjects of each individual researcher.

  • 1 Similar Profiles
Tall buildings Engineering & Materials Science
Hoists Engineering & Materials Science
Costs Engineering & Materials Science
Planning Engineering & Materials Science
Genetic algorithms Engineering & Materials Science
Productivity Engineering & Materials Science
building construction Earth & Environmental Sciences
Case based reasoning Engineering & Materials Science

Network Recent external collaboration on country level. Dive into details by clicking on the dots.

Research Output 2004 2019

  • 837 Citations
  • 13 h-Index
  • 41 Article
  • 15 Conference contribution
  • 3 Paper
Tall buildings
Planning
Managers
Costs
1 Citations

Advanced planning model of formwork layout for productivity improvement in high-rise building construction

Lee, D., Lim, H., Kim, T., Cho, H. H. & Kang, K. I., 2018 Jan 1, In : Automation in Construction. 85, p. 232-240 9 p.

Research output: Contribution to journalArticle

Productivity
Planning
Engineers
Heuristic methods
Costs

Application of machine learning technology for construction site

Ahn, H., Lee, D., Lee, S., Kim, T., Cho, H. H. & Kang, K. I., 2018 Jan 1.

Research output: Contribution to conferencePaper

Learning systems
Tower cranes
Accidents
Inspection
Personnel

Early-warning performance monitoring system (EPMS) using the business information of a project

Kim, C. W., Yoo, W. S., Lim, H., Yu, I., Cho, H. H. & Kang, K. I., 2018 Jul 1, In : International Journal of Project Management. 36, 5, p. 730-743 14 p.

Research output: Contribution to journalArticle

Monitoring
Industry
Business information
Early warning
Performance monitoring

Flexible double-cage hoist for high operational efficiency in tall building construction

Kim, T., Lee, U. K., Kim, S. W., Lim, H., Kim, C. W., Cho, H. H. & Kang, K. I., 2018 Dec 1, In : Automation in Construction. 96, p. 280-291 12 p.

Research output: Contribution to journalArticle

Cages (mine hoists)
Hoists
Tall buildings
Costs