If you made any changes in Pure these will be visible here soon.

Research Output 1995 2019

  • 710 Citations
  • 15 h-Index
  • 28 Article
  • 17 Conference contribution
Filter
Article
2019

An efficient algorithm for unequal area facilities layout planning with input and output points

Park, H. & Seo, Y. H., 2019 Jan 1, In : INFOR. 57, 1, p. 56-74 19 p.

Research output: Contribution to journalArticle

Planning
Materials handling
Heuristic algorithms
Costs
Experiments
2018
Tabu search
Simulated annealing
Integer programming
Heuristic algorithms
Experiments
6 Citations (Scopus)

Path regeneration decisions in a dynamic environment

Han, J. & Seo, Y. H., 2018 Jun 1, In : Information Sciences. 450, p. 39-52 14 p.

Research output: Contribution to journalArticle

Regeneration
Dynamic Environment
Path
Motion planning
Decision making
2017
36 Citations (Scopus)

Mobile robot path planning with surrounding point set and path improvement

Han, J. & Seo, Y. H., 2017 Aug 1, In : Applied Soft Computing Journal. 57, p. 35-47 13 p.

Research output: Contribution to journalArticle

Motion planning
Mobile robots
Geometry
2016
5 Citations (Scopus)

Mechanism to minimise the assembly time with feeder assignment for a multi-headed gantry and high-speed SMT machine

Han, J. & Seo, Y. H., 2016 Sep 3, (Accepted/In press) In : International Journal of Production Research. p. 1-20 20 p.

Research output: Contribution to journalArticle

Surface mount technology
Mountings
Printed circuit boards
Nozzles
Genetic algorithms
2015
1 Citation (Scopus)
Heuristic algorithms
Scheduling
Particle swarm optimization (PSO)
Experiments
2014
8 Citations (Scopus)
Materials handling
Integer programming
Systems analysis
Semiconductor materials
Heuristic algorithms
26 Citations (Scopus)

A tabu search algorithm for simultaneous machine/AGV scheduling problem

Zheng, Y., Xiao, Y. & Seo, Y. H., 2014 Jan 1, In : International Journal of Production Research. 52, 19, p. 5748-5763 16 p.

Research output: Contribution to journalArticle

Tabu search
Scheduling
Linear programming
Flexible manufacturing systems
Heuristic algorithms
2013
34 Citations (Scopus)

An improved particle swarm optimization for the resource-constrained project scheduling problem

Jia, Q. & Seo, Y. H., 2013 Jan 11, In : International Journal of Advanced Manufacturing Technology. 67, 9-12, p. 2627-2638 12 p.

Research output: Contribution to journalArticle

Particle swarm optimization (PSO)
Scheduling
Project management
Planning
Experiments
13 Citations (Scopus)

A two-step heuristic algorithm for layout design of unequal-sized facilities with input/output points

Xiao, Y., Seo, Y. H. & Seo, M., 2013 Jul 1, In : International Journal of Production Research. 51, 14, p. 4200-4222 23 p.

Research output: Contribution to journalArticle

Heuristic algorithms
Integer programming
Simulated annealing
Materials handling
Layout
24 Citations (Scopus)
Facility Layout
Resource-constrained Project Scheduling
Scheduling Problem
Permutation
Scheduling
2007
41 Citations (Scopus)

Block assembly planning in shipbuilding using case-based reasoning

Seo, Y. H., Sheen, D. & Kim, T., 2007 Jan 1, In : Expert Systems with Applications. 32, 1, p. 245-253 9 p.

Research output: Contribution to journalArticle

Case based reasoning
Shipbuilding
Process planning
Planning
Constraint satisfaction problems
12 Citations (Scopus)

Tabu search algorithm for flexible flow path design of unidirectional automated-guided vehicle systems

Seo, Y. H., Lee, C. U. & Moon, C., 2007 Jul 1, In : OR Spectrum. 29, 3, p. 471-487 17 p.

Research output: Contribution to journalArticle

Tabu search
Automated guided vehicles
Experiment
Mathematical model
Long-term memory
2006
36 Citations (Scopus)

Adaptive genetic algorithm for advanced planning in manufacturing supply chain

Moon, C., Seo, Y. H., Yun, Y. & Gen, M., 2006 Aug 1, In : Journal of Intelligent Manufacturing. 17, 4, p. 509-522 14 p.

Research output: Contribution to journalArticle

Adaptive algorithms
Supply chains
Genetic algorithms
Planning
Integer programming
15 Citations (Scopus)

An effective coding approach for multiobjective integrated resource selection and operation sequences problem

Zhang, H., Gen, M. & Seo, Y. H., 2006 Aug 1, In : Journal of Intelligent Manufacturing. 17, 4, p. 385-397 13 p.

Research output: Contribution to journalArticle

Chromosomes
Genetic algorithms
Machine tools
24 Citations (Scopus)

Development of Web-based CAM system

Seo, Y. H., Kim, D. Y. & Suh, S. H., 2006 Feb 1, In : International Journal of Advanced Manufacturing Technology. 28, 1-2, p. 101-108 8 p.

Research output: Contribution to journalArticle

Computer aided manufacturing
Machining
Internet
Common object request broker architecture (CORBA)
Virtual reality

Foreword

Gen, M., Seo, Y. H., Takahashi, K. & Park, J., 2006 Sep 1, In : Computers and Industrial Engineering. 51, 1

Research output: Contribution to journalArticle

6 Citations (Scopus)

Integrated design of workcells and unidirectional flowpath layout

Seo, Y. H., Sheen, D., Moon, C. & Kim, T., 2006 Sep 1, In : Computers and Industrial Engineering. 51, 1, p. 142-153 12 p.

Research output: Contribution to journalArticle

Layout
Cellular manufacturing
Manufacturing
Integer programming
Heuristic algorithms
1 Citation (Scopus)
Cellular manufacturing
Petri nets
Assembly machines
Simulators
Productivity
2005
10 Citations (Scopus)

Advanced planning for minimizing makespan with load balancing in multi-plant chain

Moon, C. & Seo, Y. H., 2005 Oct 15, In : International Journal of Production Research. 43, 20, p. 4381-4396 16 p.

Research output: Contribution to journalArticle

Adaptive algorithms
Resource allocation
Genetic algorithms
Planning
Moon
93 Citations (Scopus)

Evolutionary algorithm for advanced process planning and scheduling in a multi-plant

Moon, C. & Seo, Y. H., 2005 Mar 1, In : Computers and Industrial Engineering. 48, 2, p. 311-325 15 p.

Research output: Contribution to journalArticle

Planning and Scheduling
Process Planning
Process planning
Evolutionary algorithms
Evolutionary Algorithms
2003
1 Citation (Scopus)
Ships
Fabrication
Shipyards
Mathematical models
Flow time
52 Citations (Scopus)

Modelling and implementation of internet-based virtual machine tools

Suh, S. H., Seo, Y. H., Lee, S. M., Choi, T. H., Jeong, G. S. & Kim, D. Y., 2003 Jun 24, In : International Journal of Advanced Manufacturing Technology. 21, 7, p. 516-522 7 p.

Research output: Contribution to journalArticle

Machine tools
Internet
Computer simulation
Virtual machine
Websites
2002
133 Citations (Scopus)

An efficient genetic algorithm for the traveling salesman problem with precedence constraints

Moon, C., Kim, J., Choi, G. & Seo, Y. H., 2002 Aug 1, In : European Journal of Operational Research. 140, 3, p. 606-617 12 p.

Research output: Contribution to journalArticle

salesman
Precedence Constraints
Traveling salesman problem
Travelling salesman problems
Efficient Algorithms
32 Citations (Scopus)

Integrated machine tool selection and operation sequencing with capacity and precedence constraints using genetic algorithm

Moon, C., Lee, M., Seo, Y. H. & Lee, Y. H., 2002 Sep 1, In : Computers and Industrial Engineering. 43, 3, p. 605-621 17 p.

Research output: Contribution to journalArticle

Precedence Constraints
Capacity Constraints
Machine Tool
Machine tools
Sequencing
1999
27 Citations (Scopus)

Integrated manufacturing planning for an AGV-based FMS

Seo, Y. H. & Egbelu, P. J., 1999 Apr 20, In : International Journal of Production Economics. 60, p. 473-478 6 p.

Research output: Contribution to journalArticle

Planning
Processing
Identification (control systems)
Manufacturing
Integrated
1996
16 Citations (Scopus)

Process plan selection based on product mix and production volume

Seo, Y. H. & Egbelu, P. J., 1996 Sep 1, In : International Journal of Production Research. 34, 9, p. 2639-2655 17 p.

Research output: Contribution to journalArticle

Materials handling
Heuristic algorithms
Machining
Product mix
Scenarios
1995
30 Citations (Scopus)

Flexible guidepath design for automated guided vehicle systems

Seo, Y. H. & Egbelu, P. J., 1995, In : International Journal of Production Research. 33, 4, p. 1135-1156 22 p.

Research output: Contribution to journalArticle

Automated guided vehicles
Layout
Heuristic algorithms
Mathematical models
Guarantee