A novel operation strategies for shunt-type FACTS controllers in the KEPCO system

Byunghoon Chang, Byong Jun Lee, Joe H. Chow

Research output: Contribution to journalArticle

5 Citations (Scopus)

Abstract

In this letter, the application schemes for a coordinated control system of multiple FACTS controllers are presented to enhance the voltage stability around the Seoul metropolitan area. To coordinate the control of FACTS devices, fV analysis was performed with real-time network data transferred from the SCADA/EMS system. First, the fV analysis method is performed for the contingency set. Then the new operational setpoint is calculated with the VQ analysis method if it is deemed necessary to increase the margin of stability for a specific contingency. Consequently, the security of the power system is enhanced with a coordinated control system of multiple FACTS controllers and analyzed with a year 2007 SCADA/EMS data.

Original languageEnglish
Pages (from-to)1639-1640
Number of pages2
JournalIEEE Transactions on Power Systems
Volume24
Issue number3
DOIs
Publication statusPublished - 2009 Jul 3

Fingerprint

Controllers
Control systems
SCADA systems
Voltage control
Flexible AC transmission systems

Keywords

  • Coordinated control
  • Korean power system
  • STATCOM
  • SVC
  • Switched shunt capacitor

ASJC Scopus subject areas

  • Electrical and Electronic Engineering
  • Energy Engineering and Power Technology

Cite this

A novel operation strategies for shunt-type FACTS controllers in the KEPCO system. / Chang, Byunghoon; Lee, Byong Jun; Chow, Joe H.

In: IEEE Transactions on Power Systems, Vol. 24, No. 3, 03.07.2009, p. 1639-1640.

Research output: Contribution to journalArticle

@article{28ed43c4aa874d639e77c50723556236,
title = "A novel operation strategies for shunt-type FACTS controllers in the KEPCO system",
abstract = "In this letter, the application schemes for a coordinated control system of multiple FACTS controllers are presented to enhance the voltage stability around the Seoul metropolitan area. To coordinate the control of FACTS devices, fV analysis was performed with real-time network data transferred from the SCADA/EMS system. First, the fV analysis method is performed for the contingency set. Then the new operational setpoint is calculated with the VQ analysis method if it is deemed necessary to increase the margin of stability for a specific contingency. Consequently, the security of the power system is enhanced with a coordinated control system of multiple FACTS controllers and analyzed with a year 2007 SCADA/EMS data.",
keywords = "Coordinated control, Korean power system, STATCOM, SVC, Switched shunt capacitor",
author = "Byunghoon Chang and Lee, {Byong Jun} and Chow, {Joe H.}",
year = "2009",
month = "7",
day = "3",
doi = "10.1109/TPWRS.2009.2023276",
language = "English",
volume = "24",
pages = "1639--1640",
journal = "IEEE Transactions on Power Systems",
issn = "0885-8950",
publisher = "Institute of Electrical and Electronics Engineers Inc.",
number = "3",

}

TY - JOUR

T1 - A novel operation strategies for shunt-type FACTS controllers in the KEPCO system

AU - Chang, Byunghoon

AU - Lee, Byong Jun

AU - Chow, Joe H.

PY - 2009/7/3

Y1 - 2009/7/3

N2 - In this letter, the application schemes for a coordinated control system of multiple FACTS controllers are presented to enhance the voltage stability around the Seoul metropolitan area. To coordinate the control of FACTS devices, fV analysis was performed with real-time network data transferred from the SCADA/EMS system. First, the fV analysis method is performed for the contingency set. Then the new operational setpoint is calculated with the VQ analysis method if it is deemed necessary to increase the margin of stability for a specific contingency. Consequently, the security of the power system is enhanced with a coordinated control system of multiple FACTS controllers and analyzed with a year 2007 SCADA/EMS data.

AB - In this letter, the application schemes for a coordinated control system of multiple FACTS controllers are presented to enhance the voltage stability around the Seoul metropolitan area. To coordinate the control of FACTS devices, fV analysis was performed with real-time network data transferred from the SCADA/EMS system. First, the fV analysis method is performed for the contingency set. Then the new operational setpoint is calculated with the VQ analysis method if it is deemed necessary to increase the margin of stability for a specific contingency. Consequently, the security of the power system is enhanced with a coordinated control system of multiple FACTS controllers and analyzed with a year 2007 SCADA/EMS data.

KW - Coordinated control

KW - Korean power system

KW - STATCOM

KW - SVC

KW - Switched shunt capacitor

UR - http://www.scopus.com/inward/record.url?scp=68349160827&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=68349160827&partnerID=8YFLogxK

U2 - 10.1109/TPWRS.2009.2023276

DO - 10.1109/TPWRS.2009.2023276

M3 - Article

AN - SCOPUS:68349160827

VL - 24

SP - 1639

EP - 1640

JO - IEEE Transactions on Power Systems

JF - IEEE Transactions on Power Systems

SN - 0885-8950

IS - 3

ER -