A solution for glasses assembly problem in cell processes of LCD via optimization-based approach

Jonghyuck Park, Jihyun Kim, Jun-Geol Baek, Sung Shick Kim

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

As the size of LCD panel grows larger, the importance of the accurate assembly of glasses increases. Various Run-to-Run controllers are used to arrange the locations of transistors and color filter printed on each glass. When the contour of a panel on the glass is distorted than others, however, overall differences of each panel are increased in order to diminish the relatively large discrepancy in the distorted panel; this situation causes many defective panels. In this paper, some optimization models will be presented to resolve this problem. By setting the tolerance limit of the acceptable panel as a constraint, an optimization problem, which maximizes the acceptable panels, is solved to find the optimal recipe of panel assembly process. Numerical experiments are conducted to show its efficiency.

Original languageEnglish
Title of host publication2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009
Pages60-64
Number of pages5
DOIs
Publication statusPublished - 2009 Dec 1
Event2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009 - Seoul, Korea, Republic of
Duration: 2009 Nov 172009 Nov 20

Other

Other2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009
CountryKorea, Republic of
CitySeoul
Period09/11/1709/11/20

Fingerprint

Liquid crystal displays
Glass
Transistors
Color
Controllers
Experiments

Keywords

  • Cell Processes
  • Mathematical Programming
  • Optimization-Based Approach
  • Panel Assembly

ASJC Scopus subject areas

  • Electrical and Electronic Engineering
  • Industrial and Manufacturing Engineering

Cite this

Park, J., Kim, J., Baek, J-G., & Kim, S. S. (2009). A solution for glasses assembly problem in cell processes of LCD via optimization-based approach. In 2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009 (pp. 60-64). [5376931] https://doi.org/10.1109/ISAM.2009.5376931

A solution for glasses assembly problem in cell processes of LCD via optimization-based approach. / Park, Jonghyuck; Kim, Jihyun; Baek, Jun-Geol; Kim, Sung Shick.

2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009. 2009. p. 60-64 5376931.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Park, J, Kim, J, Baek, J-G & Kim, SS 2009, A solution for glasses assembly problem in cell processes of LCD via optimization-based approach. in 2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009., 5376931, pp. 60-64, 2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009, Seoul, Korea, Republic of, 09/11/17. https://doi.org/10.1109/ISAM.2009.5376931
Park J, Kim J, Baek J-G, Kim SS. A solution for glasses assembly problem in cell processes of LCD via optimization-based approach. In 2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009. 2009. p. 60-64. 5376931 https://doi.org/10.1109/ISAM.2009.5376931
Park, Jonghyuck ; Kim, Jihyun ; Baek, Jun-Geol ; Kim, Sung Shick. / A solution for glasses assembly problem in cell processes of LCD via optimization-based approach. 2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009. 2009. pp. 60-64
@inproceedings{9c0728e98e0942f480fea77428228d8a,
title = "A solution for glasses assembly problem in cell processes of LCD via optimization-based approach",
abstract = "As the size of LCD panel grows larger, the importance of the accurate assembly of glasses increases. Various Run-to-Run controllers are used to arrange the locations of transistors and color filter printed on each glass. When the contour of a panel on the glass is distorted than others, however, overall differences of each panel are increased in order to diminish the relatively large discrepancy in the distorted panel; this situation causes many defective panels. In this paper, some optimization models will be presented to resolve this problem. By setting the tolerance limit of the acceptable panel as a constraint, an optimization problem, which maximizes the acceptable panels, is solved to find the optimal recipe of panel assembly process. Numerical experiments are conducted to show its efficiency.",
keywords = "Cell Processes, Mathematical Programming, Optimization-Based Approach, Panel Assembly",
author = "Jonghyuck Park and Jihyun Kim and Jun-Geol Baek and Kim, {Sung Shick}",
year = "2009",
month = "12",
day = "1",
doi = "10.1109/ISAM.2009.5376931",
language = "English",
isbn = "9781424446278",
pages = "60--64",
booktitle = "2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009",

}

TY - GEN

T1 - A solution for glasses assembly problem in cell processes of LCD via optimization-based approach

AU - Park, Jonghyuck

AU - Kim, Jihyun

AU - Baek, Jun-Geol

AU - Kim, Sung Shick

PY - 2009/12/1

Y1 - 2009/12/1

N2 - As the size of LCD panel grows larger, the importance of the accurate assembly of glasses increases. Various Run-to-Run controllers are used to arrange the locations of transistors and color filter printed on each glass. When the contour of a panel on the glass is distorted than others, however, overall differences of each panel are increased in order to diminish the relatively large discrepancy in the distorted panel; this situation causes many defective panels. In this paper, some optimization models will be presented to resolve this problem. By setting the tolerance limit of the acceptable panel as a constraint, an optimization problem, which maximizes the acceptable panels, is solved to find the optimal recipe of panel assembly process. Numerical experiments are conducted to show its efficiency.

AB - As the size of LCD panel grows larger, the importance of the accurate assembly of glasses increases. Various Run-to-Run controllers are used to arrange the locations of transistors and color filter printed on each glass. When the contour of a panel on the glass is distorted than others, however, overall differences of each panel are increased in order to diminish the relatively large discrepancy in the distorted panel; this situation causes many defective panels. In this paper, some optimization models will be presented to resolve this problem. By setting the tolerance limit of the acceptable panel as a constraint, an optimization problem, which maximizes the acceptable panels, is solved to find the optimal recipe of panel assembly process. Numerical experiments are conducted to show its efficiency.

KW - Cell Processes

KW - Mathematical Programming

KW - Optimization-Based Approach

KW - Panel Assembly

UR - http://www.scopus.com/inward/record.url?scp=77949357054&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=77949357054&partnerID=8YFLogxK

U2 - 10.1109/ISAM.2009.5376931

DO - 10.1109/ISAM.2009.5376931

M3 - Conference contribution

SN - 9781424446278

SP - 60

EP - 64

BT - 2009 IEEE International Symposium on Assembly and Manufacturing, ISAM 2009

ER -