A study on the voltage calculation method for ESS operation plan in hybrid generation system

S. Jung, G. Jang

Research output: Contribution to journalArticle

Abstract

The designed hybrid generation system (HGS) not only consider the voltage condition of connection point but also do limit output profile by following the transmission system operator’s directions. Therefore, when developing large-scaled system including a number of HGS, appropriate compensation strategy based on the system components and impacts should be formulized with considering inner system’s characteristics. The ESS operation plan in HGS should be supported by precise voltage expectation method because the system has large physical areas: it includes almost 150m DC section. Especially, since the previous system is not considering power limiting method at the DC section which is integrated with wave generators, an appropriate ESS compensation could provide a lots of solutions such as power control and quality issue. In this paper, an active power control algorithm with expected voltage based on the DC power flow is introduced, and imposed to the simulation process that is performed on EMTDC environment. Further, the comparison with the normal control process is carried out based on the composed layout in ongoing project.

Original languageEnglish
Article number415
Pages (from-to)581-584
Number of pages4
JournalRenewable Energy and Power Quality Journal
Volume1
Issue number13
DOIs
Publication statusPublished - 2015 Apr

Fingerprint

Power control
Electric potential
Power quality
Compensation and Redress

Keywords

  • Combined generator
  • DC power flow
  • ESS application
  • System dynamic
  • Wave energy

ASJC Scopus subject areas

  • Renewable Energy, Sustainability and the Environment
  • Energy Engineering and Power Technology
  • Electrical and Electronic Engineering

Cite this

A study on the voltage calculation method for ESS operation plan in hybrid generation system. / Jung, S.; Jang, G.

In: Renewable Energy and Power Quality Journal, Vol. 1, No. 13, 415, 04.2015, p. 581-584.

Research output: Contribution to journalArticle

@article{13dd7af118404e178352d83e2ad4db5c,
title = "A study on the voltage calculation method for ESS operation plan in hybrid generation system",
abstract = "The designed hybrid generation system (HGS) not only consider the voltage condition of connection point but also do limit output profile by following the transmission system operator’s directions. Therefore, when developing large-scaled system including a number of HGS, appropriate compensation strategy based on the system components and impacts should be formulized with considering inner system’s characteristics. The ESS operation plan in HGS should be supported by precise voltage expectation method because the system has large physical areas: it includes almost 150m DC section. Especially, since the previous system is not considering power limiting method at the DC section which is integrated with wave generators, an appropriate ESS compensation could provide a lots of solutions such as power control and quality issue. In this paper, an active power control algorithm with expected voltage based on the DC power flow is introduced, and imposed to the simulation process that is performed on EMTDC environment. Further, the comparison with the normal control process is carried out based on the composed layout in ongoing project.",
keywords = "Combined generator, DC power flow, ESS application, System dynamic, Wave energy",
author = "S. Jung and G. Jang",
year = "2015",
month = "4",
doi = "10.24084/repqj13.415",
language = "English",
volume = "1",
pages = "581--584",
journal = "Renewable Energy and Power Quality Journal",
issn = "2172-038X",
publisher = "European Association for the Development of Renewable Energies, Environment and Power Quality",
number = "13",

}

TY - JOUR

T1 - A study on the voltage calculation method for ESS operation plan in hybrid generation system

AU - Jung, S.

AU - Jang, G.

PY - 2015/4

Y1 - 2015/4

N2 - The designed hybrid generation system (HGS) not only consider the voltage condition of connection point but also do limit output profile by following the transmission system operator’s directions. Therefore, when developing large-scaled system including a number of HGS, appropriate compensation strategy based on the system components and impacts should be formulized with considering inner system’s characteristics. The ESS operation plan in HGS should be supported by precise voltage expectation method because the system has large physical areas: it includes almost 150m DC section. Especially, since the previous system is not considering power limiting method at the DC section which is integrated with wave generators, an appropriate ESS compensation could provide a lots of solutions such as power control and quality issue. In this paper, an active power control algorithm with expected voltage based on the DC power flow is introduced, and imposed to the simulation process that is performed on EMTDC environment. Further, the comparison with the normal control process is carried out based on the composed layout in ongoing project.

AB - The designed hybrid generation system (HGS) not only consider the voltage condition of connection point but also do limit output profile by following the transmission system operator’s directions. Therefore, when developing large-scaled system including a number of HGS, appropriate compensation strategy based on the system components and impacts should be formulized with considering inner system’s characteristics. The ESS operation plan in HGS should be supported by precise voltage expectation method because the system has large physical areas: it includes almost 150m DC section. Especially, since the previous system is not considering power limiting method at the DC section which is integrated with wave generators, an appropriate ESS compensation could provide a lots of solutions such as power control and quality issue. In this paper, an active power control algorithm with expected voltage based on the DC power flow is introduced, and imposed to the simulation process that is performed on EMTDC environment. Further, the comparison with the normal control process is carried out based on the composed layout in ongoing project.

KW - Combined generator

KW - DC power flow

KW - ESS application

KW - System dynamic

KW - Wave energy

UR - http://www.scopus.com/inward/record.url?scp=85073329448&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85073329448&partnerID=8YFLogxK

U2 - 10.24084/repqj13.415

DO - 10.24084/repqj13.415

M3 - Article

AN - SCOPUS:85073329448

VL - 1

SP - 581

EP - 584

JO - Renewable Energy and Power Quality Journal

JF - Renewable Energy and Power Quality Journal

SN - 2172-038X

IS - 13

M1 - 415

ER -