CMS RPC commissioning of the existing detector during the long shutdown

CMS Collaboration

Research output: Contribution to journalArticle

Abstract

February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 1034/cm2/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.

Original languageEnglish
Article numberC10043
JournalJournal of Instrumentation
Volume9
Issue number10
DOIs
Publication statusPublished - 2014 Oct 1

Fingerprint

shutdowns
Commissioning
Colliding beam accelerators
Detector
Detectors
detectors
consolidation
Electric potential
Consolidation
low voltage
Particle accelerators
planning
high voltages
Luminance
accelerators
Low Voltage
chambers
luminosity
Accelerator
Planning

Keywords

  • Gaseous detectors
  • Particle tracking detectors (Gaseous detectors)

ASJC Scopus subject areas

  • Instrumentation
  • Mathematical Physics

Cite this

CMS RPC commissioning of the existing detector during the long shutdown. / CMS Collaboration.

In: Journal of Instrumentation, Vol. 9, No. 10, C10043, 01.10.2014.

Research output: Contribution to journalArticle

@article{bed633c151b545619d5668b651f50755,
title = "CMS RPC commissioning of the existing detector during the long shutdown",
abstract = "February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 1034/cm2/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.",
keywords = "Gaseous detectors, Particle tracking detectors (Gaseous detectors)",
author = "{CMS Collaboration} and A. Cimmino and Y. Ban and J. Cai and Q. Li and S. Liu and S. Qian and D. Wang and Z. Xu and F. Zhang and Y. Choi and D. Kim and J. Goh and Suyong Choi and Byungsik Hong and Kang, {J. W.} and M. Kang and Kwon, {J. H.} and Lee, {K. S.} and Lee, {S. K.} and Park, {Sung Keun} and Pant, {L. M.} and Mohanty, {A. K.} and R. Chudasama and Singh, {J. B.} and V. Bhatnagar and A. Mehta and R. Kumar and S. Cauwenbergh and S. Costantini and S. Crucy and A. Fagot and G. Garcia and A. Ocampo and D. Poyraz and S. Salva and F. Thyssen and M. Tytgat and N. Zaganidis and Doninck, {W. V.} and A. Cabrera and L. Chaparro and Gomez, {J. P.} and B. Gomez and Sanabria, {J. C.} and C. Avila and A. Ahmad and S. Muhammad and M. Shoaib and H. Hoorani and I. Awan",
year = "2014",
month = "10",
day = "1",
doi = "10.1088/1748-0221/9/10/C10043",
language = "English",
volume = "9",
journal = "Journal of Instrumentation",
issn = "1748-0221",
publisher = "IOP Publishing Ltd.",
number = "10",

}

TY - JOUR

T1 - CMS RPC commissioning of the existing detector during the long shutdown

AU - CMS Collaboration

AU - Cimmino, A.

AU - Ban, Y.

AU - Cai, J.

AU - Li, Q.

AU - Liu, S.

AU - Qian, S.

AU - Wang, D.

AU - Xu, Z.

AU - Zhang, F.

AU - Choi, Y.

AU - Kim, D.

AU - Goh, J.

AU - Choi, Suyong

AU - Hong, Byungsik

AU - Kang, J. W.

AU - Kang, M.

AU - Kwon, J. H.

AU - Lee, K. S.

AU - Lee, S. K.

AU - Park, Sung Keun

AU - Pant, L. M.

AU - Mohanty, A. K.

AU - Chudasama, R.

AU - Singh, J. B.

AU - Bhatnagar, V.

AU - Mehta, A.

AU - Kumar, R.

AU - Cauwenbergh, S.

AU - Costantini, S.

AU - Crucy, S.

AU - Fagot, A.

AU - Garcia, G.

AU - Ocampo, A.

AU - Poyraz, D.

AU - Salva, S.

AU - Thyssen, F.

AU - Tytgat, M.

AU - Zaganidis, N.

AU - Doninck, W. V.

AU - Cabrera, A.

AU - Chaparro, L.

AU - Gomez, J. P.

AU - Gomez, B.

AU - Sanabria, J. C.

AU - Avila, C.

AU - Ahmad, A.

AU - Muhammad, S.

AU - Shoaib, M.

AU - Hoorani, H.

AU - Awan, I.

PY - 2014/10/1

Y1 - 2014/10/1

N2 - February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 1034/cm2/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.

AB - February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 1034/cm2/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.

KW - Gaseous detectors

KW - Particle tracking detectors (Gaseous detectors)

UR - http://www.scopus.com/inward/record.url?scp=84919341391&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84919341391&partnerID=8YFLogxK

U2 - 10.1088/1748-0221/9/10/C10043

DO - 10.1088/1748-0221/9/10/C10043

M3 - Article

VL - 9

JO - Journal of Instrumentation

JF - Journal of Instrumentation

SN - 1748-0221

IS - 10

M1 - C10043

ER -