Abstract

Prediction of the cost estimation of apartment house is an important task in the management of construction projects. This study aims at illustrating the compared results of the application of two different approaches which are used case-based reasoning (CBR) and artificial neural networks (ANN) techniques. This study is conducted by using the same 540 cases which are obtained in Korea. 30 cases among the data are used for testing. Testing error rates of 3.69% in the CBR and 6.52% in the ANN were obtained. Results showed that CBR can produce slightly more accurate results and achieve higher computational efficiency than ANN. If the use of CBR and ANN is understood better, as a result, cost estimation can be predicted with reasonability, all parties involved in the construction process could save considerable money.

Original languageEnglish
Pages (from-to)113-120
Number of pages8
JournalJournal of Asian Architecture and Building Engineering
Volume4
Issue number1
DOIs
Publication statusPublished - 2005

Fingerprint

Case based reasoning
apartment
neural network
housing
Neural networks
costs
Costs
Apartment houses
apartment house
Testing
Computational efficiency
Korea
money
efficiency
Prediction
Case-based Reasoning
Artificial Neural Network
Apartment
management

Keywords

  • Apartment house
  • Artificial neural networks
  • Case-based reasoning
  • Cost estimation

ASJC Scopus subject areas

  • Architecture
  • Civil and Structural Engineering
  • Cultural Studies
  • Building and Construction
  • Arts and Humanities (miscellaneous)

Cite this

Comparing Cost Prediction Methods for Apartment Housing Projects : CBR versus ANN. / Kim, Sang Yong; Choi, Jae Won; Kim, Gwang Hee; Kang, Kyung In.

In: Journal of Asian Architecture and Building Engineering, Vol. 4, No. 1, 2005, p. 113-120.

Research output: Contribution to journalArticle

@article{1a7d4c32d1e94c90878f853b75bdd4a2,
title = "Comparing Cost Prediction Methods for Apartment Housing Projects: CBR versus ANN",
abstract = "Prediction of the cost estimation of apartment house is an important task in the management of construction projects. This study aims at illustrating the compared results of the application of two different approaches which are used case-based reasoning (CBR) and artificial neural networks (ANN) techniques. This study is conducted by using the same 540 cases which are obtained in Korea. 30 cases among the data are used for testing. Testing error rates of 3.69{\%} in the CBR and 6.52{\%} in the ANN were obtained. Results showed that CBR can produce slightly more accurate results and achieve higher computational efficiency than ANN. If the use of CBR and ANN is understood better, as a result, cost estimation can be predicted with reasonability, all parties involved in the construction process could save considerable money.",
keywords = "Apartment house, Artificial neural networks, Case-based reasoning, Cost estimation",
author = "Kim, {Sang Yong} and Choi, {Jae Won} and Kim, {Gwang Hee} and Kang, {Kyung In}",
year = "2005",
doi = "10.3130/jaabe.4.113",
language = "English",
volume = "4",
pages = "113--120",
journal = "Journal of Asian Architecture and Building Engineering",
issn = "1346-7581",
publisher = "Architectural Institute of Japan",
number = "1",

}

TY - JOUR

T1 - Comparing Cost Prediction Methods for Apartment Housing Projects

T2 - CBR versus ANN

AU - Kim, Sang Yong

AU - Choi, Jae Won

AU - Kim, Gwang Hee

AU - Kang, Kyung In

PY - 2005

Y1 - 2005

N2 - Prediction of the cost estimation of apartment house is an important task in the management of construction projects. This study aims at illustrating the compared results of the application of two different approaches which are used case-based reasoning (CBR) and artificial neural networks (ANN) techniques. This study is conducted by using the same 540 cases which are obtained in Korea. 30 cases among the data are used for testing. Testing error rates of 3.69% in the CBR and 6.52% in the ANN were obtained. Results showed that CBR can produce slightly more accurate results and achieve higher computational efficiency than ANN. If the use of CBR and ANN is understood better, as a result, cost estimation can be predicted with reasonability, all parties involved in the construction process could save considerable money.

AB - Prediction of the cost estimation of apartment house is an important task in the management of construction projects. This study aims at illustrating the compared results of the application of two different approaches which are used case-based reasoning (CBR) and artificial neural networks (ANN) techniques. This study is conducted by using the same 540 cases which are obtained in Korea. 30 cases among the data are used for testing. Testing error rates of 3.69% in the CBR and 6.52% in the ANN were obtained. Results showed that CBR can produce slightly more accurate results and achieve higher computational efficiency than ANN. If the use of CBR and ANN is understood better, as a result, cost estimation can be predicted with reasonability, all parties involved in the construction process could save considerable money.

KW - Apartment house

KW - Artificial neural networks

KW - Case-based reasoning

KW - Cost estimation

UR - http://www.scopus.com/inward/record.url?scp=84994360479&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84994360479&partnerID=8YFLogxK

U2 - 10.3130/jaabe.4.113

DO - 10.3130/jaabe.4.113

M3 - Article

VL - 4

SP - 113

EP - 120

JO - Journal of Asian Architecture and Building Engineering

JF - Journal of Asian Architecture and Building Engineering

SN - 1346-7581

IS - 1