As a proportion of generation using renewable energy increases in a power system, the need for facility investment is increasing in not only the distribution system but also the transmission system. However, it is ineffcient to invest in new equipment to deal with the short peak output of renewable energy generation. For this reason, this paper proposes a method for operating the grid more flexibly, through an optimal operating strategy of the direct current (DC) line at medium-voltage (MV) level, thereby delaying the facility investment in the transmission line. In order to determine the optimal operating point of the converter connected with a DC line, the swarm intelligence-based optimization technique, which can minimize multi-objective function, is used. In addition, in order to overcome the communication dependency of the centralized control, which needs to receive information about the optimal operating point computed by the system operator, this paper proposes a decentralized emergency control (DEC) method in case of a communication fault.

Original languageEnglish
Article number1589
JournalEnergies
Volume12
Issue number9
DOIs
Publication statusPublished - 2019 Jan 1

Fingerprint

Power transmission
Renewable Energy
Line
Communication
Electric lines
Swarm Intelligence
Distribution System
Transmission Line
Emergency
Converter
Power System
Optimization Techniques
Decentralized
Electric potential
Proportion
Fault
Objective function
Voltage
Grid
Minimise

Keywords

  • Medium voltage direct current
  • Multi-objective optimization
  • Operation strategy
  • Voltage source converter

ASJC Scopus subject areas

  • Renewable Energy, Sustainability and the Environment
  • Energy Engineering and Power Technology
  • Energy (miscellaneous)
  • Control and Optimization
  • Electrical and Electronic Engineering

Cite this

Enhancing line capacity utilization in power transmission system using active MVDC Link. / Han, Changhee; Song, Sungyoon; Kim, Juyong; Jang, Gilsoo.

In: Energies, Vol. 12, No. 9, 1589, 01.01.2019.

Research output: Contribution to journalArticle

Han, Changhee ; Song, Sungyoon ; Kim, Juyong ; Jang, Gilsoo. / Enhancing line capacity utilization in power transmission system using active MVDC Link. In: Energies. 2019 ; Vol. 12, No. 9.
@article{b481d3719268434d82a4b9ce381dd362,
title = "Enhancing line capacity utilization in power transmission system using active MVDC Link",
abstract = "As a proportion of generation using renewable energy increases in a power system, the need for facility investment is increasing in not only the distribution system but also the transmission system. However, it is ineffcient to invest in new equipment to deal with the short peak output of renewable energy generation. For this reason, this paper proposes a method for operating the grid more flexibly, through an optimal operating strategy of the direct current (DC) line at medium-voltage (MV) level, thereby delaying the facility investment in the transmission line. In order to determine the optimal operating point of the converter connected with a DC line, the swarm intelligence-based optimization technique, which can minimize multi-objective function, is used. In addition, in order to overcome the communication dependency of the centralized control, which needs to receive information about the optimal operating point computed by the system operator, this paper proposes a decentralized emergency control (DEC) method in case of a communication fault.",
keywords = "Medium voltage direct current, Multi-objective optimization, Operation strategy, Voltage source converter",
author = "Changhee Han and Sungyoon Song and Juyong Kim and Gilsoo Jang",
year = "2019",
month = "1",
day = "1",
doi = "10.3390/en12091589",
language = "English",
volume = "12",
journal = "Energies",
issn = "1996-1073",
publisher = "Multidisciplinary Digital Publishing Institute (MDPI)",
number = "9",

}

TY - JOUR

T1 - Enhancing line capacity utilization in power transmission system using active MVDC Link

AU - Han, Changhee

AU - Song, Sungyoon

AU - Kim, Juyong

AU - Jang, Gilsoo

PY - 2019/1/1

Y1 - 2019/1/1

N2 - As a proportion of generation using renewable energy increases in a power system, the need for facility investment is increasing in not only the distribution system but also the transmission system. However, it is ineffcient to invest in new equipment to deal with the short peak output of renewable energy generation. For this reason, this paper proposes a method for operating the grid more flexibly, through an optimal operating strategy of the direct current (DC) line at medium-voltage (MV) level, thereby delaying the facility investment in the transmission line. In order to determine the optimal operating point of the converter connected with a DC line, the swarm intelligence-based optimization technique, which can minimize multi-objective function, is used. In addition, in order to overcome the communication dependency of the centralized control, which needs to receive information about the optimal operating point computed by the system operator, this paper proposes a decentralized emergency control (DEC) method in case of a communication fault.

AB - As a proportion of generation using renewable energy increases in a power system, the need for facility investment is increasing in not only the distribution system but also the transmission system. However, it is ineffcient to invest in new equipment to deal with the short peak output of renewable energy generation. For this reason, this paper proposes a method for operating the grid more flexibly, through an optimal operating strategy of the direct current (DC) line at medium-voltage (MV) level, thereby delaying the facility investment in the transmission line. In order to determine the optimal operating point of the converter connected with a DC line, the swarm intelligence-based optimization technique, which can minimize multi-objective function, is used. In addition, in order to overcome the communication dependency of the centralized control, which needs to receive information about the optimal operating point computed by the system operator, this paper proposes a decentralized emergency control (DEC) method in case of a communication fault.

KW - Medium voltage direct current

KW - Multi-objective optimization

KW - Operation strategy

KW - Voltage source converter

UR - http://www.scopus.com/inward/record.url?scp=85065999090&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85065999090&partnerID=8YFLogxK

U2 - 10.3390/en12091589

DO - 10.3390/en12091589

M3 - Article

VL - 12

JO - Energies

JF - Energies

SN - 1996-1073

IS - 9

M1 - 1589

ER -