Heating energy performance and part load ratio characteristics of boiler staging in an office building

Da Young Lee, Byeong Mo Seo, Yeo Beom Yoon, Sung Hyup Hong, Jong Min Choi, Kwang Ho Lee

Research output: Contribution to journalArticle

Abstract

Commercial buildings account for significant portions of the total building energy in South Korea and thus a variety of research on the boiler operation related to heating energy in office buildings has been carried out thus far. However, most of the researches have been conducted on the boiler itself, i.e., the part load ratio characteristics and the corresponding gas energy consumption patterns are not analyzed in the existing studies. In this study, the part load ratio and the operating characteristics of gas boiler have been analyzed within an office building equipped with the conventional variable air volume system. In addition, the gas consumption among different boiler staging schemes has been comparatively analyzed. As a result, significant portions of total operating hours, heating load and energy consumption has been found to be in a part load ratio range of 0 through 40% and thus energy consumption is significantly affected by boiler efficiency at low part load conditions. This suggests that boiler operation at the part load is an important factor in commercial buildings. In addition, utilizing sequential boiler staging scheme can save a gas usage of about 7%. For annual heating energy saving, applying the sequential control boiler with a 3:7 proportion staging is considered to be the optimal control algorithm for maximum efficiency of boilers.

Original languageEnglish
JournalFrontiers in Energy
DOIs
Publication statusAccepted/In press - 2018 Jan 1
Externally publishedYes

Fingerprint

Office buildings
Boilers
Loads (forces)
Heating
Energy utilization
Gases
Boiler control
Energy conservation
Air

Keywords

  • boiler
  • boiler staging
  • EnergyPlus
  • gas consumption
  • office building
  • part load ratio

ASJC Scopus subject areas

  • Energy Engineering and Power Technology

Cite this

Heating energy performance and part load ratio characteristics of boiler staging in an office building. / Lee, Da Young; Seo, Byeong Mo; Yoon, Yeo Beom; Hong, Sung Hyup; Choi, Jong Min; Lee, Kwang Ho.

In: Frontiers in Energy, 01.01.2018.

Research output: Contribution to journalArticle

Lee, Da Young ; Seo, Byeong Mo ; Yoon, Yeo Beom ; Hong, Sung Hyup ; Choi, Jong Min ; Lee, Kwang Ho. / Heating energy performance and part load ratio characteristics of boiler staging in an office building. In: Frontiers in Energy. 2018.
@article{cf440f4107c04c68a68e0c003f9cddfb,
title = "Heating energy performance and part load ratio characteristics of boiler staging in an office building",
abstract = "Commercial buildings account for significant portions of the total building energy in South Korea and thus a variety of research on the boiler operation related to heating energy in office buildings has been carried out thus far. However, most of the researches have been conducted on the boiler itself, i.e., the part load ratio characteristics and the corresponding gas energy consumption patterns are not analyzed in the existing studies. In this study, the part load ratio and the operating characteristics of gas boiler have been analyzed within an office building equipped with the conventional variable air volume system. In addition, the gas consumption among different boiler staging schemes has been comparatively analyzed. As a result, significant portions of total operating hours, heating load and energy consumption has been found to be in a part load ratio range of 0 through 40{\%} and thus energy consumption is significantly affected by boiler efficiency at low part load conditions. This suggests that boiler operation at the part load is an important factor in commercial buildings. In addition, utilizing sequential boiler staging scheme can save a gas usage of about 7{\%}. For annual heating energy saving, applying the sequential control boiler with a 3:7 proportion staging is considered to be the optimal control algorithm for maximum efficiency of boilers.",
keywords = "boiler, boiler staging, EnergyPlus, gas consumption, office building, part load ratio",
author = "Lee, {Da Young} and Seo, {Byeong Mo} and Yoon, {Yeo Beom} and Hong, {Sung Hyup} and Choi, {Jong Min} and Lee, {Kwang Ho}",
year = "2018",
month = "1",
day = "1",
doi = "10.1007/s11708-018-0596-5",
language = "English",
journal = "Frontiers in Energy",
issn = "2095-1701",
publisher = "Springer Science + Business Media",

}

TY - JOUR

T1 - Heating energy performance and part load ratio characteristics of boiler staging in an office building

AU - Lee, Da Young

AU - Seo, Byeong Mo

AU - Yoon, Yeo Beom

AU - Hong, Sung Hyup

AU - Choi, Jong Min

AU - Lee, Kwang Ho

PY - 2018/1/1

Y1 - 2018/1/1

N2 - Commercial buildings account for significant portions of the total building energy in South Korea and thus a variety of research on the boiler operation related to heating energy in office buildings has been carried out thus far. However, most of the researches have been conducted on the boiler itself, i.e., the part load ratio characteristics and the corresponding gas energy consumption patterns are not analyzed in the existing studies. In this study, the part load ratio and the operating characteristics of gas boiler have been analyzed within an office building equipped with the conventional variable air volume system. In addition, the gas consumption among different boiler staging schemes has been comparatively analyzed. As a result, significant portions of total operating hours, heating load and energy consumption has been found to be in a part load ratio range of 0 through 40% and thus energy consumption is significantly affected by boiler efficiency at low part load conditions. This suggests that boiler operation at the part load is an important factor in commercial buildings. In addition, utilizing sequential boiler staging scheme can save a gas usage of about 7%. For annual heating energy saving, applying the sequential control boiler with a 3:7 proportion staging is considered to be the optimal control algorithm for maximum efficiency of boilers.

AB - Commercial buildings account for significant portions of the total building energy in South Korea and thus a variety of research on the boiler operation related to heating energy in office buildings has been carried out thus far. However, most of the researches have been conducted on the boiler itself, i.e., the part load ratio characteristics and the corresponding gas energy consumption patterns are not analyzed in the existing studies. In this study, the part load ratio and the operating characteristics of gas boiler have been analyzed within an office building equipped with the conventional variable air volume system. In addition, the gas consumption among different boiler staging schemes has been comparatively analyzed. As a result, significant portions of total operating hours, heating load and energy consumption has been found to be in a part load ratio range of 0 through 40% and thus energy consumption is significantly affected by boiler efficiency at low part load conditions. This suggests that boiler operation at the part load is an important factor in commercial buildings. In addition, utilizing sequential boiler staging scheme can save a gas usage of about 7%. For annual heating energy saving, applying the sequential control boiler with a 3:7 proportion staging is considered to be the optimal control algorithm for maximum efficiency of boilers.

KW - boiler

KW - boiler staging

KW - EnergyPlus

KW - gas consumption

KW - office building

KW - part load ratio

UR - http://www.scopus.com/inward/record.url?scp=85058064238&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85058064238&partnerID=8YFLogxK

U2 - 10.1007/s11708-018-0596-5

DO - 10.1007/s11708-018-0596-5

M3 - Article

AN - SCOPUS:85058064238

JO - Frontiers in Energy

JF - Frontiers in Energy

SN - 2095-1701

ER -