Level 1 trigger system for the Belle II experiment

Yoshihito Iwasaki, ByungGu Cheon, Eunil Won, Gary Varner

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

The Super KEKB factory project at KEK in Japan with the ultimate goal of integrated luminosity of 50 ab-1 has been prepared to study the Beyond Standard Model physics from B meson and tau/charm weak decays. A online trigger system is indispensable to suppress a mount of beam background events from high beam currents of electron and positron and to enhance physics oriented events. Two kind of Level-1 online trigger components are mainly taken into account, a track trigger and a energy trigger. The track trigger is composed of 2D and 3D tracking algorithms, and the energy trigger has total energy and isolated cluster trigger algorithms. In addition, precise trigger timing and muon tagging are extracted from Time of Projection detector and KLM detector, respectively.

Original languageEnglish
Title of host publicationConference Record - 2010 17th IEEE-NPSS Real Time Conference, RT10
DOIs
Publication statusPublished - 2010 Dec 1
Event2010 17th IEEE-NPSS Real Time Conference, RT10 - Lisbon, Portugal
Duration: 2010 May 242010 May 28

Other

Other2010 17th IEEE-NPSS Real Time Conference, RT10
CountryPortugal
CityLisbon
Period10/5/2410/5/28

Fingerprint

Physics
Detectors
Positrons
Industrial plants
Luminance
Experiments
Electrons

ASJC Scopus subject areas

  • Artificial Intelligence
  • Computer Science Applications

Cite this

Iwasaki, Y., Cheon, B., Won, E., & Varner, G. (2010). Level 1 trigger system for the Belle II experiment. In Conference Record - 2010 17th IEEE-NPSS Real Time Conference, RT10 [5750454] https://doi.org/10.1109/RTC.2010.5750454

Level 1 trigger system for the Belle II experiment. / Iwasaki, Yoshihito; Cheon, ByungGu; Won, Eunil; Varner, Gary.

Conference Record - 2010 17th IEEE-NPSS Real Time Conference, RT10. 2010. 5750454.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Iwasaki, Y, Cheon, B, Won, E & Varner, G 2010, Level 1 trigger system for the Belle II experiment. in Conference Record - 2010 17th IEEE-NPSS Real Time Conference, RT10., 5750454, 2010 17th IEEE-NPSS Real Time Conference, RT10, Lisbon, Portugal, 10/5/24. https://doi.org/10.1109/RTC.2010.5750454
Iwasaki Y, Cheon B, Won E, Varner G. Level 1 trigger system for the Belle II experiment. In Conference Record - 2010 17th IEEE-NPSS Real Time Conference, RT10. 2010. 5750454 https://doi.org/10.1109/RTC.2010.5750454
Iwasaki, Yoshihito ; Cheon, ByungGu ; Won, Eunil ; Varner, Gary. / Level 1 trigger system for the Belle II experiment. Conference Record - 2010 17th IEEE-NPSS Real Time Conference, RT10. 2010.
@inproceedings{c5bea65d2654457c96f8e009a25f93dc,
title = "Level 1 trigger system for the Belle II experiment",
abstract = "The Super KEKB factory project at KEK in Japan with the ultimate goal of integrated luminosity of 50 ab-1 has been prepared to study the Beyond Standard Model physics from B meson and tau/charm weak decays. A online trigger system is indispensable to suppress a mount of beam background events from high beam currents of electron and positron and to enhance physics oriented events. Two kind of Level-1 online trigger components are mainly taken into account, a track trigger and a energy trigger. The track trigger is composed of 2D and 3D tracking algorithms, and the energy trigger has total energy and isolated cluster trigger algorithms. In addition, precise trigger timing and muon tagging are extracted from Time of Projection detector and KLM detector, respectively.",
author = "Yoshihito Iwasaki and ByungGu Cheon and Eunil Won and Gary Varner",
year = "2010",
month = "12",
day = "1",
doi = "10.1109/RTC.2010.5750454",
language = "English",
isbn = "9781424471096",
booktitle = "Conference Record - 2010 17th IEEE-NPSS Real Time Conference, RT10",

}

TY - GEN

T1 - Level 1 trigger system for the Belle II experiment

AU - Iwasaki, Yoshihito

AU - Cheon, ByungGu

AU - Won, Eunil

AU - Varner, Gary

PY - 2010/12/1

Y1 - 2010/12/1

N2 - The Super KEKB factory project at KEK in Japan with the ultimate goal of integrated luminosity of 50 ab-1 has been prepared to study the Beyond Standard Model physics from B meson and tau/charm weak decays. A online trigger system is indispensable to suppress a mount of beam background events from high beam currents of electron and positron and to enhance physics oriented events. Two kind of Level-1 online trigger components are mainly taken into account, a track trigger and a energy trigger. The track trigger is composed of 2D and 3D tracking algorithms, and the energy trigger has total energy and isolated cluster trigger algorithms. In addition, precise trigger timing and muon tagging are extracted from Time of Projection detector and KLM detector, respectively.

AB - The Super KEKB factory project at KEK in Japan with the ultimate goal of integrated luminosity of 50 ab-1 has been prepared to study the Beyond Standard Model physics from B meson and tau/charm weak decays. A online trigger system is indispensable to suppress a mount of beam background events from high beam currents of electron and positron and to enhance physics oriented events. Two kind of Level-1 online trigger components are mainly taken into account, a track trigger and a energy trigger. The track trigger is composed of 2D and 3D tracking algorithms, and the energy trigger has total energy and isolated cluster trigger algorithms. In addition, precise trigger timing and muon tagging are extracted from Time of Projection detector and KLM detector, respectively.

UR - http://www.scopus.com/inward/record.url?scp=79955981772&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=79955981772&partnerID=8YFLogxK

U2 - 10.1109/RTC.2010.5750454

DO - 10.1109/RTC.2010.5750454

M3 - Conference contribution

AN - SCOPUS:79955981772

SN - 9781424471096

BT - Conference Record - 2010 17th IEEE-NPSS Real Time Conference, RT10

ER -