TY - JOUR
T1 - Packet delay analysis of dynamic bandwidth allocation scheme in an ethernet PON
AU - Park, Chul Geun
AU - Han, Dong Hwan
AU - Kim, Bara
PY - 2005
Y1 - 2005
N2 - In this paper, we deal with the packet delay of a dynamic bandwidth allocation(DBA) scheme in an Ethernet passive optical network(EPON). We focus on the interleaved polling system with a gated service discipline. On the access side, input traffic may be aggregated from a number of users. So we assume that input packets arrive at an optical network unit(ONU) according to Poisson process. We use a continuous time queueing model in order to find the mean waiting time of an arbitrary packet. We give some numerical results to investigate the delay performances for the symmetric polling system with statistically identical stations.
AB - In this paper, we deal with the packet delay of a dynamic bandwidth allocation(DBA) scheme in an Ethernet passive optical network(EPON). We focus on the interleaved polling system with a gated service discipline. On the access side, input traffic may be aggregated from a number of users. So we assume that input packets arrive at an optical network unit(ONU) according to Poisson process. We use a continuous time queueing model in order to find the mean waiting time of an arbitrary packet. We give some numerical results to investigate the delay performances for the symmetric polling system with statistically identical stations.
UR - http://www.scopus.com/inward/record.url?scp=22944466322&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=22944466322&partnerID=8YFLogxK
U2 - 10.1007/978-3-540-31956-6_20
DO - 10.1007/978-3-540-31956-6_20
M3 - Conference article
AN - SCOPUS:22944466322
VL - 3420
SP - 161
EP - 168
JO - Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
JF - Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
SN - 0302-9743
IS - I
T2 - Networking - ICN 2005
Y2 - 17 April 2005 through 21 April 2005
ER -