R&D towards the CMS RPC Phase-2 upgrade

A. Fagot, A. Cimmino, S. Crucy, M. Gul, A. A.O. Rios, M. Tytgat, N. Zaganidis, S. Aly, Y. Assran, A. Radi, A. Sayed, G. Singh, M. Abbrescia, G. Iaselli, M. Maggi, G. Pugliese, P. Verwilligen, W. Van Doninck, S. Colafranceschi, A. SharmaL. Benussi, S. Bianco, D. Piccolo, F. Primavera, V. Bhatnagar, R. Kumari, A. Mehta, J. Singh, A. Ahmad, W. Ahmed, M. I. Asghar, I. M. Awan, H. R. Hoorani, S. Muhammad, M. A. Shah, H. Shahzad, S. W. Cho, Su-Yong Choi, Byungsik Hong, M. H. Kang, K. S. Lee, J. H. Lim, S. K. Park, M. S. Kim, M. Gouzevitch, G. Grenier, F. Lagarde, I. B. Laktineh, S. Carpinteyro Bernardino, C. Uribe Estrada, I. Pedraza, S. Carrillo Moreno, F. Vazquez Valencia, L. M. Pant, S. Buontempo, N. Cavallo, M. Esposito, F. Fabozzi, G. Lanza, I. Orso, L. Lista, S. Meola, M. Merola, P. Paolucci, F. Thyssen, A. Braghieri, A. Magnani, P. Montagna, C. Riccardi, P. Salvini, I. Vai, P. Vitulo, Y. Ban, S. J. Qian, M. Choi, Y. Choi, J. Goh, D. Kim, A. Aleksandrov, R. Hadjiiska, P. Iaydjiev, M. Rodozov, S. Stoykova, G. Sultanov, M. Vutova, A. Dimitrov, L. Litov, B. Pavlov, P. Petkov, I. Bagaturia, D. Lomidze, C. Avila, A. Cabrera, J. C. Sanabria, I. Crotty, J. Vaitkus

Research output: Contribution to journalArticle

Abstract

The high pseudo-rapidity region of the CMS muon system is covered by Cathode Strip Chambers (CSC) only and lacks redundant coverage despite the fact that it is a challenging region for muons in terms of backgrounds and momentum resolution. In order to maintain good efficiency for the muon trigger in this region additional RPCs are planned to be installed in the two outermost stations at low angle named RE3/1 and RE4/1. These stations will use RPCs with finer granularity and good timing resolution to mitigate background effects and to increase the redundancy of the system.

Original languageEnglish
Article numberC09017
JournalJournal of Instrumentation
Volume11
Issue number9
DOIs
Publication statusPublished - 2016 Sep 26

Fingerprint

Redundancy
muons
Momentum
Cathodes
stations
redundancy
Granularity
Trigger
Strip
Timing
strip
Coverage
actuators
chambers
cathodes
time measurement
momentum
Angle
Background

Keywords

  • Front-end electronics for detector readout
  • Materials for gaseous detectors
  • Particle tracking detectors (Gaseous detectors)
  • Resistiveplate chambers

ASJC Scopus subject areas

  • Instrumentation
  • Mathematical Physics

Cite this

Fagot, A., Cimmino, A., Crucy, S., Gul, M., Rios, A. A. O., Tytgat, M., ... Vaitkus, J. (2016). R&D towards the CMS RPC Phase-2 upgrade. Journal of Instrumentation, 11(9), [C09017]. https://doi.org/10.1088/1748-0221/11/09/C09017

R&D towards the CMS RPC Phase-2 upgrade. / Fagot, A.; Cimmino, A.; Crucy, S.; Gul, M.; Rios, A. A.O.; Tytgat, M.; Zaganidis, N.; Aly, S.; Assran, Y.; Radi, A.; Sayed, A.; Singh, G.; Abbrescia, M.; Iaselli, G.; Maggi, M.; Pugliese, G.; Verwilligen, P.; Van Doninck, W.; Colafranceschi, S.; Sharma, A.; Benussi, L.; Bianco, S.; Piccolo, D.; Primavera, F.; Bhatnagar, V.; Kumari, R.; Mehta, A.; Singh, J.; Ahmad, A.; Ahmed, W.; Asghar, M. I.; Awan, I. M.; Hoorani, H. R.; Muhammad, S.; Shah, M. A.; Shahzad, H.; Cho, S. W.; Choi, Su-Yong; Hong, Byungsik; Kang, M. H.; Lee, K. S.; Lim, J. H.; Park, S. K.; Kim, M. S.; Gouzevitch, M.; Grenier, G.; Lagarde, F.; Laktineh, I. B.; Carpinteyro Bernardino, S.; Uribe Estrada, C.; Pedraza, I.; Carrillo Moreno, S.; Vazquez Valencia, F.; Pant, L. M.; Buontempo, S.; Cavallo, N.; Esposito, M.; Fabozzi, F.; Lanza, G.; Orso, I.; Lista, L.; Meola, S.; Merola, M.; Paolucci, P.; Thyssen, F.; Braghieri, A.; Magnani, A.; Montagna, P.; Riccardi, C.; Salvini, P.; Vai, I.; Vitulo, P.; Ban, Y.; Qian, S. J.; Choi, M.; Choi, Y.; Goh, J.; Kim, D.; Aleksandrov, A.; Hadjiiska, R.; Iaydjiev, P.; Rodozov, M.; Stoykova, S.; Sultanov, G.; Vutova, M.; Dimitrov, A.; Litov, L.; Pavlov, B.; Petkov, P.; Bagaturia, I.; Lomidze, D.; Avila, C.; Cabrera, A.; Sanabria, J. C.; Crotty, I.; Vaitkus, J.

In: Journal of Instrumentation, Vol. 11, No. 9, C09017, 26.09.2016.

Research output: Contribution to journalArticle

Fagot, A, Cimmino, A, Crucy, S, Gul, M, Rios, AAO, Tytgat, M, Zaganidis, N, Aly, S, Assran, Y, Radi, A, Sayed, A, Singh, G, Abbrescia, M, Iaselli, G, Maggi, M, Pugliese, G, Verwilligen, P, Van Doninck, W, Colafranceschi, S, Sharma, A, Benussi, L, Bianco, S, Piccolo, D, Primavera, F, Bhatnagar, V, Kumari, R, Mehta, A, Singh, J, Ahmad, A, Ahmed, W, Asghar, MI, Awan, IM, Hoorani, HR, Muhammad, S, Shah, MA, Shahzad, H, Cho, SW, Choi, S-Y, Hong, B, Kang, MH, Lee, KS, Lim, JH, Park, SK, Kim, MS, Gouzevitch, M, Grenier, G, Lagarde, F, Laktineh, IB, Carpinteyro Bernardino, S, Uribe Estrada, C, Pedraza, I, Carrillo Moreno, S, Vazquez Valencia, F, Pant, LM, Buontempo, S, Cavallo, N, Esposito, M, Fabozzi, F, Lanza, G, Orso, I, Lista, L, Meola, S, Merola, M, Paolucci, P, Thyssen, F, Braghieri, A, Magnani, A, Montagna, P, Riccardi, C, Salvini, P, Vai, I, Vitulo, P, Ban, Y, Qian, SJ, Choi, M, Choi, Y, Goh, J, Kim, D, Aleksandrov, A, Hadjiiska, R, Iaydjiev, P, Rodozov, M, Stoykova, S, Sultanov, G, Vutova, M, Dimitrov, A, Litov, L, Pavlov, B, Petkov, P, Bagaturia, I, Lomidze, D, Avila, C, Cabrera, A, Sanabria, JC, Crotty, I & Vaitkus, J 2016, 'R&D towards the CMS RPC Phase-2 upgrade', Journal of Instrumentation, vol. 11, no. 9, C09017. https://doi.org/10.1088/1748-0221/11/09/C09017
Fagot A, Cimmino A, Crucy S, Gul M, Rios AAO, Tytgat M et al. R&D towards the CMS RPC Phase-2 upgrade. Journal of Instrumentation. 2016 Sep 26;11(9). C09017. https://doi.org/10.1088/1748-0221/11/09/C09017
Fagot, A. ; Cimmino, A. ; Crucy, S. ; Gul, M. ; Rios, A. A.O. ; Tytgat, M. ; Zaganidis, N. ; Aly, S. ; Assran, Y. ; Radi, A. ; Sayed, A. ; Singh, G. ; Abbrescia, M. ; Iaselli, G. ; Maggi, M. ; Pugliese, G. ; Verwilligen, P. ; Van Doninck, W. ; Colafranceschi, S. ; Sharma, A. ; Benussi, L. ; Bianco, S. ; Piccolo, D. ; Primavera, F. ; Bhatnagar, V. ; Kumari, R. ; Mehta, A. ; Singh, J. ; Ahmad, A. ; Ahmed, W. ; Asghar, M. I. ; Awan, I. M. ; Hoorani, H. R. ; Muhammad, S. ; Shah, M. A. ; Shahzad, H. ; Cho, S. W. ; Choi, Su-Yong ; Hong, Byungsik ; Kang, M. H. ; Lee, K. S. ; Lim, J. H. ; Park, S. K. ; Kim, M. S. ; Gouzevitch, M. ; Grenier, G. ; Lagarde, F. ; Laktineh, I. B. ; Carpinteyro Bernardino, S. ; Uribe Estrada, C. ; Pedraza, I. ; Carrillo Moreno, S. ; Vazquez Valencia, F. ; Pant, L. M. ; Buontempo, S. ; Cavallo, N. ; Esposito, M. ; Fabozzi, F. ; Lanza, G. ; Orso, I. ; Lista, L. ; Meola, S. ; Merola, M. ; Paolucci, P. ; Thyssen, F. ; Braghieri, A. ; Magnani, A. ; Montagna, P. ; Riccardi, C. ; Salvini, P. ; Vai, I. ; Vitulo, P. ; Ban, Y. ; Qian, S. J. ; Choi, M. ; Choi, Y. ; Goh, J. ; Kim, D. ; Aleksandrov, A. ; Hadjiiska, R. ; Iaydjiev, P. ; Rodozov, M. ; Stoykova, S. ; Sultanov, G. ; Vutova, M. ; Dimitrov, A. ; Litov, L. ; Pavlov, B. ; Petkov, P. ; Bagaturia, I. ; Lomidze, D. ; Avila, C. ; Cabrera, A. ; Sanabria, J. C. ; Crotty, I. ; Vaitkus, J. / R&D towards the CMS RPC Phase-2 upgrade. In: Journal of Instrumentation. 2016 ; Vol. 11, No. 9.
@article{b9ef54298bef49bea9c535cf6978e48e,
title = "R&D towards the CMS RPC Phase-2 upgrade",
abstract = "The high pseudo-rapidity region of the CMS muon system is covered by Cathode Strip Chambers (CSC) only and lacks redundant coverage despite the fact that it is a challenging region for muons in terms of backgrounds and momentum resolution. In order to maintain good efficiency for the muon trigger in this region additional RPCs are planned to be installed in the two outermost stations at low angle named RE3/1 and RE4/1. These stations will use RPCs with finer granularity and good timing resolution to mitigate background effects and to increase the redundancy of the system.",
keywords = "Front-end electronics for detector readout, Materials for gaseous detectors, Particle tracking detectors (Gaseous detectors), Resistiveplate chambers",
author = "A. Fagot and A. Cimmino and S. Crucy and M. Gul and Rios, {A. A.O.} and M. Tytgat and N. Zaganidis and S. Aly and Y. Assran and A. Radi and A. Sayed and G. Singh and M. Abbrescia and G. Iaselli and M. Maggi and G. Pugliese and P. Verwilligen and {Van Doninck}, W. and S. Colafranceschi and A. Sharma and L. Benussi and S. Bianco and D. Piccolo and F. Primavera and V. Bhatnagar and R. Kumari and A. Mehta and J. Singh and A. Ahmad and W. Ahmed and Asghar, {M. I.} and Awan, {I. M.} and Hoorani, {H. R.} and S. Muhammad and Shah, {M. A.} and H. Shahzad and Cho, {S. W.} and Su-Yong Choi and Byungsik Hong and Kang, {M. H.} and Lee, {K. S.} and Lim, {J. H.} and Park, {S. K.} and Kim, {M. S.} and M. Gouzevitch and G. Grenier and F. Lagarde and Laktineh, {I. B.} and {Carpinteyro Bernardino}, S. and {Uribe Estrada}, C. and I. Pedraza and {Carrillo Moreno}, S. and {Vazquez Valencia}, F. and Pant, {L. M.} and S. Buontempo and N. Cavallo and M. Esposito and F. Fabozzi and G. Lanza and I. Orso and L. Lista and S. Meola and M. Merola and P. Paolucci and F. Thyssen and A. Braghieri and A. Magnani and P. Montagna and C. Riccardi and P. Salvini and I. Vai and P. Vitulo and Y. Ban and Qian, {S. J.} and M. Choi and Y. Choi and J. Goh and D. Kim and A. Aleksandrov and R. Hadjiiska and P. Iaydjiev and M. Rodozov and S. Stoykova and G. Sultanov and M. Vutova and A. Dimitrov and L. Litov and B. Pavlov and P. Petkov and I. Bagaturia and D. Lomidze and C. Avila and A. Cabrera and Sanabria, {J. C.} and I. Crotty and J. Vaitkus",
year = "2016",
month = "9",
day = "26",
doi = "10.1088/1748-0221/11/09/C09017",
language = "English",
volume = "11",
journal = "Journal of Instrumentation",
issn = "1748-0221",
publisher = "IOP Publishing Ltd.",
number = "9",

}

TY - JOUR

T1 - R&D towards the CMS RPC Phase-2 upgrade

AU - Fagot, A.

AU - Cimmino, A.

AU - Crucy, S.

AU - Gul, M.

AU - Rios, A. A.O.

AU - Tytgat, M.

AU - Zaganidis, N.

AU - Aly, S.

AU - Assran, Y.

AU - Radi, A.

AU - Sayed, A.

AU - Singh, G.

AU - Abbrescia, M.

AU - Iaselli, G.

AU - Maggi, M.

AU - Pugliese, G.

AU - Verwilligen, P.

AU - Van Doninck, W.

AU - Colafranceschi, S.

AU - Sharma, A.

AU - Benussi, L.

AU - Bianco, S.

AU - Piccolo, D.

AU - Primavera, F.

AU - Bhatnagar, V.

AU - Kumari, R.

AU - Mehta, A.

AU - Singh, J.

AU - Ahmad, A.

AU - Ahmed, W.

AU - Asghar, M. I.

AU - Awan, I. M.

AU - Hoorani, H. R.

AU - Muhammad, S.

AU - Shah, M. A.

AU - Shahzad, H.

AU - Cho, S. W.

AU - Choi, Su-Yong

AU - Hong, Byungsik

AU - Kang, M. H.

AU - Lee, K. S.

AU - Lim, J. H.

AU - Park, S. K.

AU - Kim, M. S.

AU - Gouzevitch, M.

AU - Grenier, G.

AU - Lagarde, F.

AU - Laktineh, I. B.

AU - Carpinteyro Bernardino, S.

AU - Uribe Estrada, C.

AU - Pedraza, I.

AU - Carrillo Moreno, S.

AU - Vazquez Valencia, F.

AU - Pant, L. M.

AU - Buontempo, S.

AU - Cavallo, N.

AU - Esposito, M.

AU - Fabozzi, F.

AU - Lanza, G.

AU - Orso, I.

AU - Lista, L.

AU - Meola, S.

AU - Merola, M.

AU - Paolucci, P.

AU - Thyssen, F.

AU - Braghieri, A.

AU - Magnani, A.

AU - Montagna, P.

AU - Riccardi, C.

AU - Salvini, P.

AU - Vai, I.

AU - Vitulo, P.

AU - Ban, Y.

AU - Qian, S. J.

AU - Choi, M.

AU - Choi, Y.

AU - Goh, J.

AU - Kim, D.

AU - Aleksandrov, A.

AU - Hadjiiska, R.

AU - Iaydjiev, P.

AU - Rodozov, M.

AU - Stoykova, S.

AU - Sultanov, G.

AU - Vutova, M.

AU - Dimitrov, A.

AU - Litov, L.

AU - Pavlov, B.

AU - Petkov, P.

AU - Bagaturia, I.

AU - Lomidze, D.

AU - Avila, C.

AU - Cabrera, A.

AU - Sanabria, J. C.

AU - Crotty, I.

AU - Vaitkus, J.

PY - 2016/9/26

Y1 - 2016/9/26

N2 - The high pseudo-rapidity region of the CMS muon system is covered by Cathode Strip Chambers (CSC) only and lacks redundant coverage despite the fact that it is a challenging region for muons in terms of backgrounds and momentum resolution. In order to maintain good efficiency for the muon trigger in this region additional RPCs are planned to be installed in the two outermost stations at low angle named RE3/1 and RE4/1. These stations will use RPCs with finer granularity and good timing resolution to mitigate background effects and to increase the redundancy of the system.

AB - The high pseudo-rapidity region of the CMS muon system is covered by Cathode Strip Chambers (CSC) only and lacks redundant coverage despite the fact that it is a challenging region for muons in terms of backgrounds and momentum resolution. In order to maintain good efficiency for the muon trigger in this region additional RPCs are planned to be installed in the two outermost stations at low angle named RE3/1 and RE4/1. These stations will use RPCs with finer granularity and good timing resolution to mitigate background effects and to increase the redundancy of the system.

KW - Front-end electronics for detector readout

KW - Materials for gaseous detectors

KW - Particle tracking detectors (Gaseous detectors)

KW - Resistiveplate chambers

UR - http://www.scopus.com/inward/record.url?scp=85068504225&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85068504225&partnerID=8YFLogxK

U2 - 10.1088/1748-0221/11/09/C09017

DO - 10.1088/1748-0221/11/09/C09017

M3 - Article

AN - SCOPUS:85068504225

VL - 11

JO - Journal of Instrumentation

JF - Journal of Instrumentation

SN - 1748-0221

IS - 9

M1 - C09017

ER -