Smart operation of HVDC systems for large penetration of wind energy resources

Dong Hee Yoon, Hwachang Song, Gilsoo Jang, Sung-Kwan Joo

Research output: Contribution to journalArticle

13 Citations (Scopus)

Abstract

The target for South Korea's domestic energy consumption is to increase the proportion of the total energy consumption supplied by renewable energy to 11% by 2030. Increasing renewable energy generation has become a natural trend, thereby making it an essential factor to be considered in research for the development of a smart grid. The power system of Jeju Island is connected to the mainland (the Korean Peninsula) through HVDC #1, with another line, HVDC #2, presently under construction. The purpose of the first HVDC construction was essentially to supply a portion of the power supply to the Jeju area. However, if the construction of HVDC #2 is completed, the role of the Jeju HVDC system in the Jeju power system will be changed significantly. If flexibility through the operation of an HVDC system is increased, more wind farms can be built on Jeju Island. In addition, depending on the operation of HVDC #1 and #2, the stability of the Jeju power system will be changed greatly. In this paper, the operation of the HVDC lines and its impacts are analyzed.

Original languageEnglish
Article number6449338
Pages (from-to)359-366
Number of pages8
JournalIEEE Transactions on Smart Grid
Volume4
Issue number1
DOIs
Publication statusPublished - 2013 Feb 8

Fingerprint

Energy resources
Wind power
Energy utilization
Farms

Keywords

  • Interface flow margin
  • Jeju Island
  • multiple HVDC
  • operation strategy
  • wind farm

ASJC Scopus subject areas

  • Computer Science(all)

Cite this

Smart operation of HVDC systems for large penetration of wind energy resources. / Yoon, Dong Hee; Song, Hwachang; Jang, Gilsoo; Joo, Sung-Kwan.

In: IEEE Transactions on Smart Grid, Vol. 4, No. 1, 6449338, 08.02.2013, p. 359-366.

Research output: Contribution to journalArticle

@article{8e7ba809611245f79112d2856f1e12b1,
title = "Smart operation of HVDC systems for large penetration of wind energy resources",
abstract = "The target for South Korea's domestic energy consumption is to increase the proportion of the total energy consumption supplied by renewable energy to 11{\%} by 2030. Increasing renewable energy generation has become a natural trend, thereby making it an essential factor to be considered in research for the development of a smart grid. The power system of Jeju Island is connected to the mainland (the Korean Peninsula) through HVDC #1, with another line, HVDC #2, presently under construction. The purpose of the first HVDC construction was essentially to supply a portion of the power supply to the Jeju area. However, if the construction of HVDC #2 is completed, the role of the Jeju HVDC system in the Jeju power system will be changed significantly. If flexibility through the operation of an HVDC system is increased, more wind farms can be built on Jeju Island. In addition, depending on the operation of HVDC #1 and #2, the stability of the Jeju power system will be changed greatly. In this paper, the operation of the HVDC lines and its impacts are analyzed.",
keywords = "Interface flow margin, Jeju Island, multiple HVDC, operation strategy, wind farm",
author = "Yoon, {Dong Hee} and Hwachang Song and Gilsoo Jang and Sung-Kwan Joo",
year = "2013",
month = "2",
day = "8",
doi = "10.1109/TSG.2012.2234488",
language = "English",
volume = "4",
pages = "359--366",
journal = "IEEE Transactions on Smart Grid",
issn = "1949-3053",
publisher = "Institute of Electrical and Electronics Engineers Inc.",
number = "1",

}

TY - JOUR

T1 - Smart operation of HVDC systems for large penetration of wind energy resources

AU - Yoon, Dong Hee

AU - Song, Hwachang

AU - Jang, Gilsoo

AU - Joo, Sung-Kwan

PY - 2013/2/8

Y1 - 2013/2/8

N2 - The target for South Korea's domestic energy consumption is to increase the proportion of the total energy consumption supplied by renewable energy to 11% by 2030. Increasing renewable energy generation has become a natural trend, thereby making it an essential factor to be considered in research for the development of a smart grid. The power system of Jeju Island is connected to the mainland (the Korean Peninsula) through HVDC #1, with another line, HVDC #2, presently under construction. The purpose of the first HVDC construction was essentially to supply a portion of the power supply to the Jeju area. However, if the construction of HVDC #2 is completed, the role of the Jeju HVDC system in the Jeju power system will be changed significantly. If flexibility through the operation of an HVDC system is increased, more wind farms can be built on Jeju Island. In addition, depending on the operation of HVDC #1 and #2, the stability of the Jeju power system will be changed greatly. In this paper, the operation of the HVDC lines and its impacts are analyzed.

AB - The target for South Korea's domestic energy consumption is to increase the proportion of the total energy consumption supplied by renewable energy to 11% by 2030. Increasing renewable energy generation has become a natural trend, thereby making it an essential factor to be considered in research for the development of a smart grid. The power system of Jeju Island is connected to the mainland (the Korean Peninsula) through HVDC #1, with another line, HVDC #2, presently under construction. The purpose of the first HVDC construction was essentially to supply a portion of the power supply to the Jeju area. However, if the construction of HVDC #2 is completed, the role of the Jeju HVDC system in the Jeju power system will be changed significantly. If flexibility through the operation of an HVDC system is increased, more wind farms can be built on Jeju Island. In addition, depending on the operation of HVDC #1 and #2, the stability of the Jeju power system will be changed greatly. In this paper, the operation of the HVDC lines and its impacts are analyzed.

KW - Interface flow margin

KW - Jeju Island

KW - multiple HVDC

KW - operation strategy

KW - wind farm

UR - http://www.scopus.com/inward/record.url?scp=84875056042&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84875056042&partnerID=8YFLogxK

U2 - 10.1109/TSG.2012.2234488

DO - 10.1109/TSG.2012.2234488

M3 - Article

AN - SCOPUS:84875056042

VL - 4

SP - 359

EP - 366

JO - IEEE Transactions on Smart Grid

JF - IEEE Transactions on Smart Grid

SN - 1949-3053

IS - 1

M1 - 6449338

ER -