T1 - Temperature distribution and frozen soil characteristics at Jangbogo Antarctic research station
AU - Hong, Seung Seo
AU - Kim, Young Seok
AU - Park, Jung Hee
AU - Lee, Jangguen
AU - Lee, Jong Sub
PY - 2012
Y1 - 2012
N2 - Temperature monitoring along the depth in construction site of the Jangbogo Antarctic research station (74° 37′S, 164° 12′E) was carried out. The thermal behavior of the frozen ground was investigated. The temperatures were measured during site investigation from February 07, 2011 to February 12, 2011. The temperature profile was analyzed in the frozen ground. The results show that the increase along with the depth. This study demonstrates that the temperature profile obtained at this site could be effective reference for the construction of the research station in the Antarctic. Copyright copy; 2012 by ASME.
AB - Temperature monitoring along the depth in construction site of the Jangbogo Antarctic research station (74° 37′S, 164° 12′E) was carried out. The thermal behavior of the frozen ground was investigated. The temperatures were measured during site investigation from February 07, 2011 to February 12, 2011. The temperature profile was analyzed in the frozen ground. The results show that the increase along with the depth. This study demonstrates that the temperature profile obtained at this site could be effective reference for the construction of the research station in the Antarctic. Copyright copy; 2012 by ASME.
UR - http://www.scopus.com/inward/record.url?scp=84884474468&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84884474468&partnerID=8YFLogxK
U2 - 10.1115/OMAE2012-83121
DO - 10.1115/OMAE2012-83121
M3 - Conference contribution
AN - SCOPUS:84884474468
SN - 9780791844915
T3 - Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering - OMAE
SP - 73
EP - 78
BT - ASME 2012 31st International Conference on Ocean, Offshore and Arctic Engineering, OMAE 2012
T2 - ASME 2012 31st International Conference on Ocean, Offshore and Arctic Engineering, OMAE 2012
Y2 - 1 July 2012 through 6 July 2012
ER -