The geumga grand bridge design using the creative problem solving technique

Min Soo Oh, Byung Gueon Jeon, Hee Yong Chung, Hak Eun Lee

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

When designing bridges there are codes which an engineer must follow. Often times these codes function as mere guidelines due to numerous variables that arise per site conditions restrictions and regulations. In such cases engineer's professional experience and judgment become a crucial tool in the design. Using the Creative Problem Solving Technique or CPST can help improve and refine various solutions or decisions that one must generate in bridge designing. CPST is composed of five fundamental steps; Defining the problem Creating potential solutions Evaluation of the potential solutions Selection of the best fit solution and Execution of the selected solution. CPST can be applied to the field of bridge engineering with respect to a number of issues. Such issues include decisions regarding site-specific conditions solutions to the owner's requests and decisions regarding the aesthetic aspects and the structural efficiency of the bridge. Once the problem has been defined all possible solutions should be brainstormed. When selecting the best solution among the brainstormed alternatives the feasibility of construction and structural calculation results must be taken into account. The execution of the best solution constitutes to producing detailed design drawings. The seven-span 795m long Geumga Grand Bridge is located in the city of Chungju on a water-front near the historically significant castle known as the "Tan-Geum-Dae," associated with the twelve-stringed Korean harp called the Gayageum. Applying the CPST in the design of the Geumga Grand Bridge the shape of the extradosed bridge has been designed with an oval shaped cross sectional deck with twelve strands of cable connected to the main tower in an effort to symbolize the shape of the Gayageum. The shape of the main tower is curved and slender replicating the shape of two hands holding the instrument.

Original languageEnglish
Title of host publicationEASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction
Publication statusPublished - 2008 Dec 1
Event11th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC-11 - Taipei, Taiwan, Province of China
Duration: 2008 Nov 192008 Nov 21

Other

Other11th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC-11
CountryTaiwan, Province of China
CityTaipei
Period08/11/1908/11/21

Fingerprint

Towers
Drawing (graphics)
Engineers
Cables
Water

Keywords

  • Creative problem solving
  • Extradosed bridge
  • Geumga grand bridge
  • Korean harp

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction

Cite this

Oh, M. S., Jeon, B. G., Chung, H. Y., & Lee, H. E. (2008). The geumga grand bridge design using the creative problem solving technique. In EASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction

The geumga grand bridge design using the creative problem solving technique. / Oh, Min Soo; Jeon, Byung Gueon; Chung, Hee Yong; Lee, Hak Eun.

EASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction. 2008.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Oh, MS, Jeon, BG, Chung, HY & Lee, HE 2008, The geumga grand bridge design using the creative problem solving technique. in EASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction. 11th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC-11, Taipei, Taiwan, Province of China, 08/11/19.
Oh MS, Jeon BG, Chung HY, Lee HE. The geumga grand bridge design using the creative problem solving technique. In EASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction. 2008
Oh, Min Soo ; Jeon, Byung Gueon ; Chung, Hee Yong ; Lee, Hak Eun. / The geumga grand bridge design using the creative problem solving technique. EASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction. 2008.
@inproceedings{2b6f247953f74ff2951b29b491a01ac8,
title = "The geumga grand bridge design using the creative problem solving technique",
abstract = "When designing bridges there are codes which an engineer must follow. Often times these codes function as mere guidelines due to numerous variables that arise per site conditions restrictions and regulations. In such cases engineer's professional experience and judgment become a crucial tool in the design. Using the Creative Problem Solving Technique or CPST can help improve and refine various solutions or decisions that one must generate in bridge designing. CPST is composed of five fundamental steps; Defining the problem Creating potential solutions Evaluation of the potential solutions Selection of the best fit solution and Execution of the selected solution. CPST can be applied to the field of bridge engineering with respect to a number of issues. Such issues include decisions regarding site-specific conditions solutions to the owner's requests and decisions regarding the aesthetic aspects and the structural efficiency of the bridge. Once the problem has been defined all possible solutions should be brainstormed. When selecting the best solution among the brainstormed alternatives the feasibility of construction and structural calculation results must be taken into account. The execution of the best solution constitutes to producing detailed design drawings. The seven-span 795m long Geumga Grand Bridge is located in the city of Chungju on a water-front near the historically significant castle known as the {"}Tan-Geum-Dae,{"} associated with the twelve-stringed Korean harp called the Gayageum. Applying the CPST in the design of the Geumga Grand Bridge the shape of the extradosed bridge has been designed with an oval shaped cross sectional deck with twelve strands of cable connected to the main tower in an effort to symbolize the shape of the Gayageum. The shape of the main tower is curved and slender replicating the shape of two hands holding the instrument.",
keywords = "Creative problem solving, Extradosed bridge, Geumga grand bridge, Korean harp",
author = "Oh, {Min Soo} and Jeon, {Byung Gueon} and Chung, {Hee Yong} and Lee, {Hak Eun}",
year = "2008",
month = "12",
day = "1",
language = "English",
booktitle = "EASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction",

}

TY - GEN

T1 - The geumga grand bridge design using the creative problem solving technique

AU - Oh, Min Soo

AU - Jeon, Byung Gueon

AU - Chung, Hee Yong

AU - Lee, Hak Eun

PY - 2008/12/1

Y1 - 2008/12/1

N2 - When designing bridges there are codes which an engineer must follow. Often times these codes function as mere guidelines due to numerous variables that arise per site conditions restrictions and regulations. In such cases engineer's professional experience and judgment become a crucial tool in the design. Using the Creative Problem Solving Technique or CPST can help improve and refine various solutions or decisions that one must generate in bridge designing. CPST is composed of five fundamental steps; Defining the problem Creating potential solutions Evaluation of the potential solutions Selection of the best fit solution and Execution of the selected solution. CPST can be applied to the field of bridge engineering with respect to a number of issues. Such issues include decisions regarding site-specific conditions solutions to the owner's requests and decisions regarding the aesthetic aspects and the structural efficiency of the bridge. Once the problem has been defined all possible solutions should be brainstormed. When selecting the best solution among the brainstormed alternatives the feasibility of construction and structural calculation results must be taken into account. The execution of the best solution constitutes to producing detailed design drawings. The seven-span 795m long Geumga Grand Bridge is located in the city of Chungju on a water-front near the historically significant castle known as the "Tan-Geum-Dae," associated with the twelve-stringed Korean harp called the Gayageum. Applying the CPST in the design of the Geumga Grand Bridge the shape of the extradosed bridge has been designed with an oval shaped cross sectional deck with twelve strands of cable connected to the main tower in an effort to symbolize the shape of the Gayageum. The shape of the main tower is curved and slender replicating the shape of two hands holding the instrument.

AB - When designing bridges there are codes which an engineer must follow. Often times these codes function as mere guidelines due to numerous variables that arise per site conditions restrictions and regulations. In such cases engineer's professional experience and judgment become a crucial tool in the design. Using the Creative Problem Solving Technique or CPST can help improve and refine various solutions or decisions that one must generate in bridge designing. CPST is composed of five fundamental steps; Defining the problem Creating potential solutions Evaluation of the potential solutions Selection of the best fit solution and Execution of the selected solution. CPST can be applied to the field of bridge engineering with respect to a number of issues. Such issues include decisions regarding site-specific conditions solutions to the owner's requests and decisions regarding the aesthetic aspects and the structural efficiency of the bridge. Once the problem has been defined all possible solutions should be brainstormed. When selecting the best solution among the brainstormed alternatives the feasibility of construction and structural calculation results must be taken into account. The execution of the best solution constitutes to producing detailed design drawings. The seven-span 795m long Geumga Grand Bridge is located in the city of Chungju on a water-front near the historically significant castle known as the "Tan-Geum-Dae," associated with the twelve-stringed Korean harp called the Gayageum. Applying the CPST in the design of the Geumga Grand Bridge the shape of the extradosed bridge has been designed with an oval shaped cross sectional deck with twelve strands of cable connected to the main tower in an effort to symbolize the shape of the Gayageum. The shape of the main tower is curved and slender replicating the shape of two hands holding the instrument.

KW - Creative problem solving

KW - Extradosed bridge

KW - Geumga grand bridge

KW - Korean harp

UR - http://www.scopus.com/inward/record.url?scp=84871118687&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84871118687&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:84871118687

BT - EASEC-11 - Eleventh East Asia-Pacific Conference on Structural Engineering and Construction

ER -