Window Proximity Tracking Method for Tall Building Construction

Hyunsu Lim, Taehoon Kim, Chang Won Kim, Hunhee Cho, Kyung In Kang

Research output: Contribution to journalConference articlepeer-review

1 Citation (Scopus)

Abstract

Window work is a major process that must precede the finishing work and has a high influence on the entire construction period of a tall buildings. Conventional window work in a tall building construction typically begins several floors below the structural work floor to prevent interference with the auto-climbing system and with the lifting of the window frame. This, however, causes a gap in the process between the structural work and the window work, which increases construction duration and cost. This study proposed a window proximity tracking method for tall building construction (WPTM) that could reduce construction cost and duration by minimizing the process gap. In a case study, the WPTM showed lower construction costs and a shorter duration than those of the existing method.

Original languageEnglish
Pages (from-to)76-81
Number of pages6
JournalProcedia Engineering
Volume196
DOIs
Publication statusPublished - 2017
EventCreative Construction Conference, CCC 2017 - Primosten, Croatia
Duration: 2017 Jun 192017 Jun 22

Keywords

  • construction
  • overlapping method
  • tall building
  • window proximity tracking
  • window work