Abstract
Window work is a major process that must precede the finishing work and has a high influence on the entire construction period of a tall buildings. Conventional window work in a tall building construction typically begins several floors below the structural work floor to prevent interference with the auto-climbing system and with the lifting of the window frame. This, however, causes a gap in the process between the structural work and the window work, which increases construction duration and cost. This study proposed a window proximity tracking method for tall building construction (WPTM) that could reduce construction cost and duration by minimizing the process gap. In a case study, the WPTM showed lower construction costs and a shorter duration than those of the existing method.
Original language | English |
---|---|
Pages (from-to) | 76-81 |
Number of pages | 6 |
Journal | Procedia Engineering |
Volume | 196 |
DOIs | |
Publication status | Published - 2017 |
Event | Creative Construction Conference, CCC 2017 - Primosten, Croatia Duration: 2017 Jun 19 → 2017 Jun 22 |
Keywords
- construction
- overlapping method
- tall building
- window proximity tracking
- window work
ASJC Scopus subject areas
- Engineering(all)